Data Centre

Mechanical Installation

Location: Singapore

Scope: Pipe & Duct Installation

Client: Sing Bridge

Highlights

  • 5 Floors Of Data Hall ( ~3000m2 Each)
  • Main Chilled Water And Condensing Water Pipe Work
  • ACMV Duct Work

Get in touch with us

Fill up the form below and we will try our best to get back to you as soon as possible.

Full name(Required)
This field is for validation purposes and should be left unchanged.